PENERIMAAN UANG AMAL JARIYAH
|
||||
PERIODE :
|
APRIL 2015
|
|||
PENERIMAAN
|
||||
No.
|
Tanggal
|
Nama
|
Alamat
|
Jumlah (Rp)
|
1
|
01-Apr-15
|
SALDO MARET 2015
|
-
|
-9.042.400
|
2
|
02-Apr-15
|
Tahlil RT 1-2-3 RW 10
|
GPA
|
830.000
|
3
|
03-Apr-15
|
Kas Masjid
|
Takmir
|
6.043.000
|
4
|
04-Apr-15
|
Hamba Allah
|
Malang
|
2.000.000
|
5
|
06-Apr-15
|
Bp. H. Nasikan
|
Surabaya
|
1.500.000
|
6
|
10-Apr-15
|
Hamba Allah
|
Malang
|
1.000.000
|
7
|
20-Apr-15
|
Bu Windi
|
GPA
|
500.000
|
8
|
24-Apr-15
|
Kas Masjid
|
Takmir
|
7.218.000
|
JUMLAH
|
10.048.600
|
|||
NOTE : Kas Jariyah Masuk Bulan Ini
|
19.091.000
|
PENGELUARAN
|
Rekap Total
|
||
No.
|
Uraian
|
Jumlah (Rp)
|
s/d Bulan ini
|
1
|
Biaya Semen
|
580.000
|
12.021.000
|
2
|
Biaya Pasir
|
800.000
|
11.450.000
|
3
|
Biaya Koral
|
-
|
6.600.000
|
4
|
Biaya Batu Bata
|
2.300.000
|
4.600.000
|
5
|
Biaya Bendrat-paku-screw
|
-
|
8.331.000
|
6
|
Biaya Besi-Baja Berat
|
-
|
187.070.000
|
7
|
Biaya Keramik
|
-
|
821.500
|
8
|
Biaya Stainless
|
1.500.000
|
10.730.000
|
9
|
Biaya Penutup Atap/Genteng-Nok
|
-
|
70.765.000
|
10
|
Biaya Galvalum/Plafon
|
498.500
|
37.907.000
|
11
|
Biaya Pengecatan
|
-
|
1.195.000
|
12
|
Biaya Kelistrikan
|
-
|
10.845.500
|
13
|
Biaya Saluran air Bersih
|
-
|
-
|
14
|
Biaya Saluran Buang
|
-
|
50.000
|
15
|
Biaya Kayu-Bambu
|
-
|
5.859.000
|
16
|
Biaya Bahan Bantu
|
-
|
3.663.000
|
17
|
Biaya Peralatan Kerja
|
-
|
3.710.500
|
18
|
Biaya Tukang-kuli
|
5.325.000
|
110.290.000
|
19
|
Biaya lain-lain :
|
||
1
|
-
|
9.648.300
|
|
2
|
-
|
-
|
|
3
|
-
|
-
|
|
4
|
-
|
-
|
|
5
|
-
|
-
|
|
JUMLAH BIAYA
|
11.003.500
|
495.556.800
|
|
SALDO APRIL 2015
|
(954.900)
|
||
JUMLAH
|
10.048.600
|
||
Malang, 30 APRIL 2015
|