PENERIMAAN UANG AMAL JARIYAH
|
||||
PERIODE :
|
JUNI 2015
|
|||
PENERIMAAN
|
||||
No.
|
Tanggal
|
Nama
|
Alamat
|
Jumlah (Rp)
|
1
|
01-Jun-15
|
SALDO MEI 2015
|
-
|
8.470.600
|
2
|
01-Jun-15
|
Imam Syaukani
|
GPA
|
1.000.000
|
3
|
01-Jun-15
|
Hasyim
|
GPA
|
600.000
|
4
|
06-Jun-15
|
Jamaah Muslimat RT3-RW12
|
GPA
|
50.000
|
5
|
10-Jun-15
|
H. Mahdi Maulana
|
Kades Ngijo
|
1.500.000
|
6
|
11-Jun-15
|
Syamsuri SH
|
GPA
|
1.500.000
|
7
|
12-Jun-15
|
Jamaah RT 1,2,3 RW 10
|
GPA
|
676.000
|
8
|
12-Jun-15
|
Bu Titin
|
GPA
|
100.000
|
9
|
13-Jun-15
|
Bpk. Manging
|
GPA
|
500.000
|
10
|
15-Jun-15
|
Tahlil RT 1,2,3 RW 10
|
GPA
|
200.000
|
11
|
17-Jun-15
|
Bpk. Didik SH
|
GPA
|
1.000.000
|
12
|
18-Jun-15
|
Bpk. Ahmad Rifai
|
Biak
|
1.000.000
|
13
|
18-Jun-15
|
Tahlil Muslimat RT 04-RW 10
|
GPA
|
1.462.000
|
14
|
18-Jun-15
|
Kas Masjid
|
Takmir
|
5.355.000
|
15
|
19-Jun-15
|
Jamaah Muslimat RW 11
|
GPA
|
1.000.000
|
16
|
19-Jun-15
|
Kas Masjid
|
Takmir
|
2.810.000
|
17
|
22-Jun-15
|
Bpk Haryanto / Lutfi
|
GPA
|
500.000
|
18
|
26-Jun-15
|
Kas Masjid
|
Takmir
|
2.527.000
|
19
|
28-Jun-15
|
M. Taufik
|
GPA
|
1.000.000
|
JUMLAH
|
31.250.600
|
|||
NOTE : Kas Jariyah Masuk Bulan Ini
|
22.780.000
|
PENGELUARAN
|
Rekap Total
|
||
No.
|
Uraian
|
Jumlah (Rp)
|
s/d Bulan ini
|
1
|
Biaya Semen
|
7.490.500
|
21.489.000
|
2
|
Biaya Pasir
|
4.630.000
|
18.071.000
|
3
|
Biaya Koral
|
1.100.000
|
7.700.000
|
4
|
Biaya Batu Bata
|
-
|
4.600.000
|
5
|
Biaya Bendrat-paku-screw
|
-
|
8.581.000
|
6
|
Biaya Besi-Baja Berat
|
1.300.000
|
191.898.000
|
7
|
Biaya Keramik
|
-
|
821.500
|
8
|
Biaya Stainless
|
-
|
10.730.000
|
9
|
Biaya Penutup Atap/Genteng-Nok
|
-
|
70.765.000
|
10
|
Biaya Galvalum/Plafon
|
-
|
37.907.000
|
11
|
Biaya Pengecatan
|
-
|
1.195.000
|
12
|
Biaya Kelistrikan
|
-
|
11.025.500
|
13
|
Biaya Saluran air Bersih
|
-
|
-
|
14
|
Biaya Saluran Buang
|
-
|
916.000
|
15
|
Biaya Kayu-Bambu
|
-
|
5.859.000
|
16
|
Biaya Bahan Bantu
|
-
|
4.122.000
|
17
|
Biaya Peralatan Kerja
|
-
|
3.710.500
|
18
|
Biaya Tukang-kuli
|
5.850.000
|
125.275.000
|
19
|
Biaya lain-lain :
|
||
1. Ongkos Pasang Keramik
|
7.860.000
|
17.508.300
|
|
2
|
-
|
-
|
|
3
|
-
|
-
|
|
4
|
-
|
-
|
|
5
|
-
|
-
|
|
JUMLAH BIAYA
|
28.230.500
|
542.173.800
|
|
SALDO JUNI 2015
|
3.020.100
|
||
JUMLAH
|
31.250.600
|
||
Malang, 30 JUNI 2015
|
Tidak ada komentar:
Posting Komentar
Sampaikan pesan Anda untuk menjadi lebih baik.